Now that the walls were up and the roof was on, the focus could be turned to the interior of the addition. Now before insulation and drywall could go in, rough plumbing and electrical needed to be done. Neither of those things are up my alley – growing up I worked in residential construction with my dad, but we always did framing and finish-type work, both inside and out. For these, we had to hire it out.
Continue reading “Then came the insulation and drywall…”